Educational Plan & Space Summary
Ai3 Worked with the Norwood Public Schools to describe the educational plan for the middle schools. The ED plan is translated into the space summary to document the size and number of spaces needed for middle school education which is the size of the building needed.
CMS Ed Plan 06.01.2021 - Revised